Friday, January 7, 2011

Day 13 Dpo Where Should Cervix Be



Specifications for public auction to award the construction of a well or sink, sources close to the people in the place and dozing, plus the replacement of the fountain called Down and watering troughs and adjacent which makes the Board of Trustees of this village Menon according to the expert and competent for correct performance are as follows:

1 The auction will take place in one act to bids to the level in The Board-School Menon before the Administrative Board to fifteen hours a day May 13 this year and is awarded to the bidder that fewer check these works, which have been admitted.

2 º To take part in the auction shall deposit all bidders in the act of the auction the sum of fifteen pesetas as a guarantee of the auction, being on deposit the amount corresponding to the highest bidder, to meet the auction and by returning the other after the rally.

3 ° It will be the highest bidder to build a well or sink in the term in which it is made of earth moving, leaning on the rock alive which will pit ten feet long by two wide, with ashlar stone carving half, the height will be sixty-five and fifteen centimeters thick (at least) three sides with sloping stone wash Bujanda, if needed , which will occupy three sides of the well, ie four meters by ten or fifteen thick and fifty wide conveniently separated into four sinks, two in the north side, one to the east and another west caught with hydraulic lime and flooring the center of the slab with well caught square and the slabs with hydraulic lime, and convey water from cooking or watering, for his standards, had to fuck with Cink or other stone-coated metal for shelter with a mixture of cement, the well will be constructed with four blocks around the box, placed on the pavement and caught up with cement or hydraulic lime.

4 ° It will be the highest bidder for beginning the works to build a wall reinforcement in the northern part at the bottom of the well with the length, width and height as the ground allows, masonry with lime slurry cubijado with flagstone and follow the platform and bottom of the well, which is recognized by the administrative board before placing the stones, which cemented.

5 th highest bidder shall be the duty of the drain, and reverse inside with hydraulic lime: 1 two kitchens and troughs adjacent to the sources, 2 º la Fuente de Abajo 3 the source of up to two months to fix the source below, may freely use the communal stone.

6 The budget of the previous works are priced on the amount of two hundred eighty pesetas and each bid be reduced by one quarter.

7 The highest bidder of these works will be completed for interim delivery on September 20 this year and will be recognized by the master mason who has done the budget.

8 th Meetings of the blocks of the Well have a channel in the center of each to connect them with hydraulic lime and bonded over with leaded iron crampons.

9 The payment will be made in two equal installments, the first to finish the work and made provisional delivery, and the second in the two months that will ultimately deliver.

Menon, May 13, 1917.

0 comments:

Post a Comment